SchoolProjectGuide

Copyright ©2024 SchoolProjectGuide

THE IMPACT OF COMMUNICATION ON THE ORGANIZATIONAL EFFICIENCY IN NEPA ENUGU

  • Department: MASS COMMUNICATION
  • Chapters: 1-5
  • Pages: 74
  • Attributes: Questionnaire, Data Analysis, Abstract
  • Views: 159
  •  :: Methodology: Primary Research
  • PRICE: ₦ 5,000
Get Complete Project

THE IMPACT OF COMMUNICATION ON THE ORGANIZATIONAL EFFICIENCY IN NEPA ENUGU

CHAPTER ONE

INTRODUCTION

1.1  BACKGROUND OF THE STUDY

What is today known as national electric power authority is a merger of the electricity cooperation of Nigeria (ECN) and Niger Dam authority (NDA) the former was created by the federal government responsible for major policies of mines and power.  It was empowered to generate transmitted distribute and sale electricity.  Consequently to take over all government downed undertaken throughout the country and to establish new ones if considered economically viable. The history of the present day NEPA would not be complete if the old police works department (PWD) of the government, which in 1896 installed the first 60kw generating set in Lagos is not mentioned.

In 1895 the preliminary investigation and planning were carried out by the public works department in Lagos at a cost of ₤ 3,206.00 The following year 1896 the their government of southern Nigeria allocated the sum of ₤1200.00 for the establishment of the first power station in Lagos which today is still the headquarter of NEPA in Lagos.  Mr. 1 Pooke was the first chief electrical engineer of the establishment known as the Lagos electric supply. The power station operated within the hours of 6.00pm to 11.00p, daily and  the maximum power demand continued to increase as a result of extension of supply to Iddo and Fbette  Metta area.  Further effort was made to increase the generating capacity of the power station.  By 1915 the total installed capacity has risen to 320kw and to 420kw in 1921. In 1924 the system introduced 2, and 3 phase 4 wire with 50 cycles and is still in use till date.  As the demand continued to increase following the understanding that the use of electricity was no longer the exclusive reserve of the rich but an essential factor in development it became.

Town

Year of commissioning

Type of set

Date of period of service

Port Harcourt

28th March 1928

475kw

1st Sept 1929

Kaduna

December 1929

2x225kw

June

1x100kw

Enugu

Railway operated

4x350kwdc

Major consumers

a set for workshop

1X200kwdc

Are the NRC and Colliery

Which govt. tool

1x200 kwdc

Supplies was for

Over on 1/4/33

1x200kwdc

1x150 kw dc

Few loan daily

Alternate

2x75kw

.